Issues that face engineers in dealing with coastal and aquatic environs are in many ways unique from those in terrestrial and developed settings. Ohio Sea Grant's programs have developed new maps/charts, improved the safety and quality of underwater welds, and more. Our artificial reef programs have enhanced habitat and more than paid for themselves in the recreational business they have generated.

Project List

Completed: Project Completed Title: Sort Title AscendingSort Title Descending Completion: Sort Title AscendingSort Title Descending Start Date: Sort Title AscendingSort Title Descending

R/EM-015 Project Status R/EM-015: Completed

Started: 9/1/1992, Status: Completed

Naturally Fluorescent Dissolved Organics Compound as Tracers of Surface Currents and Mixing in Large Water Masses

R/EM-016-PD Project Status R/EM-016-PD: Completed

Started: 9/1/1992, Status: Completed

Wetland Reductions of Pollution to the Great Lakes: Quantification of a Model for Sediment, Nutrient and Pesticides

R/OE-012 Project Status R/OE-012: Completed

Started: 9/1/1992, Status: Completed

A Climatology Protocol for Characterization of Long Term Entrainment and Resuspension

R/OE-010-PD 

Started: 7/1/1993

Underwater Welding Center

A/AS-006-PD Project Status A/AS-006-PD: Completed

Started: 9/1/1994, Status: Completed

Great Lakes Forecasting System Users Workshop and Report

R/EM-014 Project Status R/EM-014: Completed

Started: 9/1/1994, Status: Completed

A Multigrain Size Sediment Resuspension and Transport Model for Great Lakes Tributaries: An Initial Implementation for the Maumee River/Toledo Harbor Region

R/EM-018 Project Status R/EM-018: Completed

Started: 9/1/1994, Status: Completed

Naturally Fluorescent Dissolved Organic Compounds as Tracers of Surface Currents and Mixing in Large Water Masses

R/OE-011 Project Status R/OE-011: Completed

Started: 9/1/1994, Status: Completed

Development of a Smart Underwater "Wet" Welding Process

R/ZM-026 Project Status R/ZM-026: Completed

Started: 9/1/1994, Status: Completed

Design and Test of a Novel Device for the Control of Zebra Mussel Infestation in Water Piping Systems

A/AS-007-PD 

Started: 6/1/1996

Information Dissemination on Toxic Algae in Lake Erie

R/ZM-027-PD Project Status R/ZM-027-PD: Completed

Started: 6/1/1996, Status: Completed

Field Testing of a Mechanical Device for the Control of Zebra Mussel Infestation in Water Piping System

R/EM-019 

Started: 9/1/1996

An Integrated Watershed-Lake Erie Forecasting System

R/OE-013 

Started: 9/1/1996

Control Algorithm for Underwater "Wet" Flux-Cored Arc Welding Process

R/PS-015-PD 

Started: 9/1/1996

Economic and Hydrologic Analysis of Integrated Wetland Reservoir and Subirrigated Agricultural Production Systems

R/NP-001 Project Status R/NP-001: Completed

Started: 3/1/1998, Status: Completed

Coastline Mapping and Change Detection Using 1-meter Resolution Satellite Imagery